Baxi MainEco Heat 15 Manual de servicio Pagina 23

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 64
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 22
7215845 - 01 (08/14) MainEco Heat 23
Description of the Product 4
5.2.2 Electrical Supply
1. External wiring must be correctly earthed, polarised and in
accordance with relevant regulations/rules. In GB this is the
current I.E.E. Wiring Regulations. In IE reference should be
made to the current edition of ETCI rules.
2. The mains supply is 230V ~ 50Hz fused at 3A.
The method of connection to the electricity supply must
facilitate complete electrical isolation of the appliance.
Connection may be via a fused double-pole isolator
with a contact separation of at least 3mm in all poles
and servicing the boiler and system controls only.
Isolation of the boiler can be checked at the electrical
test point.
5.2.3 Hard Water Areas
1. If the area of the installation is recognised as a HARD
WATER AREA then this must be taken into account when filling
the system.
5.2.4 Bypass
1. An automatic bypass must be fitted on the system for
protection of the boiler and pump.
5.2.5 System Control
1. The system must be fitted with thermostats and TRVs to
comply with Part L of the Building Regulations.
5.2.6 Treatment of Water Circulating Systems
1. All recirculatory water systems will be subject to corrosion
unless they are flushed and an appropriate water treatment is
applied. To prevent this, follow the guidelines given in BS 7593
“Treatment of Water in Domestic Hot Water Central Heating
Systems” and the treatment manufacturers instructions.
2. Treatment must involve the use of a proprietary cleanser,
such as Sentinel X300 or X400, or Fernox F3 and an inhibitor
such as Sentinel X100 or Fernox MB-1.
3. Full instructions are supplied with the cleansing products, for
further information contact Sentinel (0800 389 4670) or Fernox
(0870 870 0362).
Failure to flush and add inhibitor to the system will
invalidate the appliance warranty.
4. It is important to check the inhibitor concentration after
installation, system modification and at every service in
accordance with the inhibitor manufacturer’s instructions. (Test
kits are available from inhibitor stockists.)
5. Complete the label supplied with the inhibitor and attach to
the inside of the boiler case. Detail of system treatment should
be added for future reference.
6. For information or advice regarding any of the above contact
Technical Enquiries 0844 871 1555.
Vista de pagina 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 63 64

Comentarios a estos manuales

Sin comentarios